Skip to main content
Pintell
Improvement of the power supply system in O‘rta Marg‘izor MFY (installation of 1 transformer substation and construction of 2.5 km of power lines) and in Oybek MFY (installation of 2 transformer substations and construction of 3.5 km of power lines), Pop | Pintell