Skip to main content
Pintell
Furqat District: in Chirqay MFY, construction of a 1.0 km pedestrian walkway with night lighting and 1.0 km of drainage channel installation; in Istiqlol MFY, asphalt paving of 4.0 km of internal roads; and in Eski MFY, construction of a 3.2 km pedestrian | Pintell