Skip to main content
Pintell
Reconstruction of the Uzun PS, construction of the pressure water pipeline (9.6km; d=930mm), pressure-regulating tanks (2x2000m3) of zone 2D, chlorination unit and construction of the main pipeline to distribution network of Zone 2 of Balkhi District | Pintell