Skip to main content
Pintell
Laying of 0.4 kV electric network along Sarishta, Yoshlik, Zavk, Guliston, Mezbon, Dustlik streets 7.92 km and installation of 10/0.4 kV transformer substation (2 pcs.) on the Kozokovul MCA site in Mingbulak district | Pintell