Supervision of Ground Investigation, Preparation of Preliminary Design, Detailed Design, Bid Documents & RAP for Section 4: km 91 to km 116 and km 121.4 to 121.7 for Baku-Shamakhi Road Section | Pintell
Synchronised 24 September 2026, 15:05
Contract Award
Supervision of Ground Investigation, Preparation of Preliminary Design, Detailed Design, Bid Documents & RAP for Section 4: km 91 to km 116 and km 121.4 to 121.7 for Baku-Shamakhi Road Section