The selected consulting firm shall (i) carry out feasibility study and prepare Preliminary Design for Kaghtsrashen gravity irrigation scheme (Phase I); (ii) prepare Detailed Design Package for constru | Pintell
Synchronised 24 September 2026, 15:02
Contract Award
The selected consulting firm shall (i) carry out feasibility study and prepare Preliminary Design for Kaghtsrashen gravity irrigation scheme (Phase I); (ii) prepare Detailed Design Package for constru