Skip to main content
Pintell
C-4 Composite Contract package in connection with New BG Railway Line of HORC project for: (i) Design & Construction of Twin Tunnel using NATM and Cut & Cover method from km 24.850 to km 29.580; (ii) Design & Installation of Ballastless Track (excluding supply of rails) from km 24.843 to km 29.680; (iif) Detailed Design, Supply, Installation, Testing & Commissioning of General Electrical Services including Supply, Erection, Testing and Commissioning of 11kV HT/LT Power and Control Cable Network, GIS Substation (11/0.433) kVA, Tunnel lighting system, etc. from km 24.843 to km 29.680; (iv) Design & Construction of Embankment, Bridges and other miscellaneous works from km 12.00 to km 18.00. | Pintell