Supervision of Ground Investigation, Preparation of Preliminary Design, Detailed Design, Bid Documents & RAP for Section 4: km 91 to km 116 and km 121.4 to 121.7 for Baku-Shamakhi Road Section | Pintell
Sinxronlangan: 24-sentabr 2026-yil, 15:05
Shartnoma natijasi
Supervision of Ground Investigation, Preparation of Preliminary Design, Detailed Design, Bid Documents & RAP for Section 4: km 91 to km 116 and km 121.4 to 121.7 for Baku-Shamakhi Road Section