Перейти к основному содержимому
Pintell
Bulakbashi district Kakir MCA (installation of 1 new substation and replacement of 4.0 km of power transmission lines with galvanized wire, replacement of old poles with new reinforced concrete poles) Chakar MCA (installation of 4 new substations and comp | Pintell