The selected consulting firm shall (i) carry out feasibility study and prepare Preliminary Design for Geghardalich gravity
irrigation scheme (Phase I); (ii) prepare Detailed Design Package for const | Pintell
Синхронизировано 24 сентября 2026 г., 15:02
Присуждение контракта
The selected consulting firm shall (i) carry out feasibility study and prepare Preliminary Design for Geghardalich gravity
irrigation scheme (Phase I); (ii) prepare Detailed Design Package for const