Перейти к основному содержимому
Pintell
Design, Supply, Installation, Testing and Commissioning of Ballast less Track and Connections of Standard gauge in Elevated Section from JLN Stadium Station to Infopark Station of Phase 2 Corridor of Kochi Metro Rail Project (from Chainage +60.000m to 10640.000m). | Pintell