Перейти к основному содержимому
Pintell
Formation of New Six lane road from Vengathur (Design Chainage: Ch 58+200) to Sengadu (Design Chainage: Ch 68+200) with paved shoulders and two lane service road on both sides in Section-III of Chennai Peripheral Ring Road Project under Package-EPC 04 on Engineering, Procurement and Construction (EPC) Mode including maintenance for 7 years. | Pintell